[ad_1]
I did it! I constructed the cubby bridge on my studio workplace space cupboards all on my own yesterday, and I couldn’t be extra thrilled with how this part is popping out! As a reminder, right here is the aim…
And in the beginning of the day yesterday, that is how the cupboards in that space of the room appeared…
The precise cupboards (the white elements) are IKEA Sektion cupboards, and I’m within the technique of customizing them. This has been a multi-post venture simply getting them thus far, so I’ll hyperlink the earlier posts on the backside of this one.
When it got here to constructing the cubby bridge, my preliminary thought was the construct it within the carport, after which deliver it inside and screw it to the perimeters of the cupboards. However I work alone. For many who are new round right here, my husband Matt has M.S. and is utterly unable to assist me with initiatives. And whereas there are a number of individuals who can be prepared to come back and assist me, I actually hate to trouble individuals for issues like this. Plus, I’m fiercely unbiased, and I thrive on determining how one can do issues myself.
In order that was the problem. How do I construct a cubby bridge, after which hoist the factor up there on my own whereas making an attempt to screw it into place? The reply? I DON’T! As an alternative, I made a decision to construct it in place. That appeared like probably the most “work smarter, not more durable” resolution to me. Right here’s how I did it…
First, I measured and marked the place I wished the bridge to be hooked up to the facet cupboards, and I hooked up a bit of scrap wooden to the facet of the cupboard with the highest fringe of the board alongside the road I simply marked. This ledger board is non permanent, and I hooked up it utilizing three 1.5-inch 16-gauge nails.
After which I repeated that course of on the opposite facet.
With my non permanent ledger boards in place, I measured and lower a bit of three/4-inch plywood for the underside of the cubby bridge. It took a few tries to get the match good, however on the second attempt, it match completely between the facet cupboards and rested on the ledger boards. You possibly can see that it bows down a bit bit within the center, however I wasn’t anxious about that. That might be corrected later within the buiding course of.
After becoming that piece, I eliminated it and drilled three pocket holes on every finish. These pocket holes are on the highest of the board, not the underside. The underside is seen when standing within the room, and I don’t need seen pocket holes, and I don’t like having to fill pocket holes on areas that might be seen.
To drill the pocket holes, I used my Kreg Pocket Gap Jig. That is the one I’ve (affiliate hyperlink), and it’s value each penny. If you wish to construct furnishings or cupboards, this instrument is a must have merchandise!
So once more, I drilled three pocket holes on every finish of that piece, ensuring I drilled the holes on the highest of the piece.
At this level, I introduced my scaffolding in to make the entire constructing course of a lot simpler. That is the one I’ve (affiliate hyperlink — additionally obtainable at Dwelling Depot), and it’s one more factor I purchased not too long ago that I ponder how I lived with out for thus lengthy!
So standing on the scaffolding, I positioned the plywood piece again on the non permanent ledger boards, pocket holes going through up, and I screwed the piece into the facet of the tall cupboards.
With that secured in place, it appeared like this. The bow within the center was nonetheless there, however I wasn’t anxious about it at this level. I simply wished to be sure that it appeared stage with the trim on the high of the window.
As soon as I used to be certain it appeared stage, I eliminated the non permanent ledger boards. That did go away three nail holes on all sides that I’ll must fill and sand, however I’m okay with that. We DIYers who work alone must do what it takes, and filling and sanding six small nail holes is a small value to pay for getting this job carried out on my own.
Subsequent, I used my desk noticed to chop the items for the ends. I hooked up these by nailing from the within of this facet piece into the plywood on the facet of the facet cupboard (i.e., within the path my nail gun is pointing beneath).
After which I additionally nailed by the underside plywood piece and into the sting of the facet piece.
After repeating that on the opposite finish, I used to be prepared to chop the again piece to suit inside the 2 finish items. That is the place the bow in that backside board can be corrected. You possibly can see the again piece set into place beneath, and the bow in that backside board remains to be seen.
To safe that again piece, I first nailed by the facet items into the sting of the again piece.
After repeating that on the opposite finish, I nailed by the underside piece into the underside fringe of the again piece.
That is what took care of the bow and straightened up the underside plywood piece. You possibly can see that there’s now not a niche between the 2 items at this level.
To be clear, aside from the six pocket screws holding the underside piece in place, I constructed the complete factor utilizing 1.5-inch 16-guage nails. I’ve full confidence that these nails will maintain. The sort that go in a nail gun are very tough, and actually seize into the wooden. If you happen to’ve ever constructed something utilizing these nails, and needed to take items aside, you know the way robust they’re. However in case you have much less confidence than I do in how nicely the nails will maintain, you may all the time use wooden glue along with the nails, and even add extra pocket holes to carry the items collectively.
Subsequent, I lower and hooked up the highest piece, nailing it throughout the three sides that sat on the facet items and the again piece. I nailed by the highest and into the sides of these three items. At this level, it was actually beginning to seem like one thing! ?
And the ultimate step of the essential construct for the cubby bridge was to chop and connect the dividers. I lower them utilizing my desk noticed, after which hooked up them identical to the opposite items.
After measuring and marking for placement of those divider items, I nailed by the underside piece into the underside edged of the divider items.
After which I nailed by the highest and into the sides of the divider items.
And with that, the essential construct was carried out! It’s going to take numerous trim and ending to get this part of cupboards to seem like I envision in my thoughts, however I’m nicely on my approach!
I so want that each single considered one of you may see this in particular person. Photos don’t do it justice. This part of cupboards went from wanting sort of small and dwarfed by that tall, huge wall, to wanting very substantial, like it could actually maintain it’s personal in opposition to that vast wall. Typically, extra is unquestionably higher! ? And I believe, when it’s all completed, it is going to look far more like customized cupboards now.
So keep tuned, as a result of arising subsequent, I’ll get the entire thing trimmed out and prepared for primer and paint. I’m getting actually enthusiastic about seeing this part completed quickly!
Addicted 2 Adorning is the place I share my DIY and adorning journey as I transform and enhance the 1948 fixer higher that my husband, Matt, and I purchased in 2013. Matt has M.S. and is unable to do bodily work, so I do the vast majority of the work on the home on my own. You possibly can be taught extra about me right here.
[ad_2]
Source link